More Pictures

view to west with work on entryways

The crew has had some trouble getting the entryways put together properly, really slow going. One thing that needed to be done was a concrete lip around the edge of the overhang to divert rain. I expect the rest of the panels will go a lot faster, maybe until they reach the connector. It is not the geodesic shape, but it is made from foam and then covered with reinforcing steel mesh and concrete.

We’ve gotten a week of rainy weather, humid but a bit cooler. They are completing setting the next tier in place today. Of course then an application of concrete in the seams, and when it is set, the fourth tier will be set in place. But, I was just told it may be next week for concrete if the rain stays as heavy as it has been.

Not a lot to say today, so I’ll just show pictures, the first three from last week when sunny.

view to north, can see framing for bathroom window

view to SE as another tier is set in place

view from old front door showing another tier in place

View to east, can see all 3 domes: small one with the window at front of this picture is the bath/laundry room, then existing dome, and then new with the beginning of the next tier of panels. My back door is on the right of the picture, with the canopy over the patio.

Advertisements

Tags:

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: