Another Inspection Passed

Another milestone – we passed inspection for the slab. Tomorrow the concrete finisher will be out for the pour, and make my floor nice and smooth.

approved for slab

Today while waiting for the inspector, the crew worked on filling in things – 500 feet of water line and next is the old cistern. Any leftover crushed stone from the cistern fill will help the existing driveway.

For the new, very long driveway, we are looking at a product that will allow us to drive on the grass and not require gravel or paving. It would be better for the environment, allowing water to drain through normally, and would be less expensive. I don’t know yet about lifetime maintenance. It does allow us to mow right over it once the grass grows up through the mesh. http://www.boddingtonsonline.com/products/grass-ground-reinforcement/grass-reinforcement-protection/turfprotecta-turf-reinforcement-mesh.php

 

Advertisements

Tags: , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: